Phase 2 Study Documents

Due to large file size, several document are available for download either in their entirety or as individual chapters. The best method for download is to right-click (for Macintosh users, CTRL-click) the link and choose "Save as..." or "Save Target as..." to your computer.

Notice of Intent

Coordination Plan

Train Simulation Report for Alternatives

Below are the individuals sections of the Environmental Technical Memorandum: Existing Conditions. Due to the size of this report, it is not available as a single file

Rail Infrastructure Report - Existing Conditions (53.9 MB, complete report, individual sections below)

Existing Conditions Report (13.2 MB, complete report, indiviual chapters below)

Final Scoping Report (350 MB, complete report, indiviual chapters below)

Transit-Oriented Development Final Report (15.1 MB compressed, complete report, individual sections below)